Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
|
Product Details:
Payment & Shipping Terms:
|
| Features: | Cost-Effective, Good Elasticity, Durable | Name: | Plastic Running Track |
|---|---|---|---|
| Type: | PU+SBR Composite Track | Structure: | PU Bonded SBR Base + EPDM Top |
| Thickness: | 13mm Standard | Top_Layer: | EPDM Spray Coat |
| Impact_Absorption: | 35-48% | Tensile_Strength: | ≥0.6 MPa |
| Service_Life: | 8-12 Years | Application: | School, Training, Community |
| Highlight: | Hybrid Plastic Running Track,High Elasticity Running Synthetic Track,Running Synthetic Track 13mm |
||
The Composite Running Track is a sports surfacing system that combines the drainage ability of porous tracks with the high resilience of fully rubberized tracks. Its structure consists of a base elastic layer, an intermediate reinforcement layer, and a top wearing layer. The base layer uses single-component polyurethane binder mixed with rubber granules to provide elasticity. The middle layer uses binder with finer granules to increase density and strength. The top layer is sprayed with EPDM or fine rubber granules. This structure offers better rebound and wear resistance while maintaining some permeability.
✅ Ideal for: school sports fields, community jogging trails, sports center training tracks, professional club venues, and projects requiring higher performance with a moderate budget.
| Parameter | Value | World Athletics Requirement |
|---|---|---|
| Thickness | 13mm standard (8mm base + 3mm reinforcement + 2mm top), customizable 10–18mm | Synthetic surface ≥13mm |
| Impact Absorption | 38–48% | 35–50% |
| Vertical Deformation | 0.8–2.5mm | 0.6–2.5mm |
| Friction Coefficient (dry/wet) | 0.5–0.8 | ≥0.5 (wet) |
| Tensile Strength | ≥0.7 MPa | ≥0.5 MPa |
| Elongation at Break | ≥50% | ≥40% |
| Water Permeability | ≈0.5–1.0 mm/min (not fully permeable, but some drainage) | Not mandatory, but no standing water preferred |
| Environmental Standards | RoHS, REACH, no heavy metals, low VOC | — |
| Service Life | 10–15 years under normal use | — |
✅ All data can be supported by third-party test reports (SGS, TÜV, etc.) according to World Athletics (ex-IAAF) recommendations for training and recreational tracks.
Key feature: The elastic layer provides cushioning, the reinforcement layer adds structural integrity, and the top layer ensures slip & wear resistance. More durable than porous tracks, more economical than full rubber tracks.
We offer two sources of granules:
| Type | Source | Advantage | Recommended for |
|---|---|---|---|
| Recycled Granules | Recycled tire rubber | Low cost, eco-friendly, adequate elasticity | Community paths, school non-competition areas, economy projects |
| Virgin Granules | Virgin EPDM or high-strength SBR | Long-lasting color, stable performance, high rubber content | Professional training tracks, premium sports parks, competition projects |
✅ Both types can be used in base, reinforcement or top layer. Mixed ratios available to balance cost and performance.
| Country | Project Type | Area | Granule Choice | Year |
|---|---|---|---|---|
| Ho Chi Minh City, Vietnam | Professional football club training track | 2,500 m² | Virgin (EPDM top, UV-resistant) | 2024 |
| São Paulo, Brazil | University sports center composite track | 4,800 m² | Recycled base + virgin reinforcement & top | 2023 |
| Lagos, Nigeria | National Youth Sports Academy | 6,200 m² | 100% recycled (economy solution) | 2024 |
| Dubai, UAE | High-end residential jogging track | 1,900 m² | Virgin (high elasticity, heat-resistant) | 2025 |
| Johannesburg, South Africa | Secondary school training field | 3,500 m² | Recycled base + virgin top | 2024 |
On-site photos & videos available upon request
Packaging:
Loading: Optimized for 20GP / 40HQ containers; loading plan provided.
Delivery time: 15 days after order confirmation as standard. Due to peak/off seasons, it may extend to 15 days – 1 month – we will inform you in advance.
Documentation: Commercial invoice, packing list, CO, B/L, MSDS, test reports (with legalization if needed).
Logistics: Partnered with international freight forwarders; sea/air/rail/multimodal shipping arranged.
Damage protection: Full inspection before shipment; optional SGS/BV third-party inspection; full insurance coverage; replacement for leakage or drum damage.
No MOQ – Whether you need materials for a 10 m² repair or a 10,000 m² full track, we can supply. Sample orders and small trial batches are welcome.
| Service | Description |
|---|---|
| Installation guidance | English construction video, written SOP; on-site technician available (fee negotiable) |
| Warranty | 2–5 years for materials (depending on series), 8 years for structural integrity |
| Claim response | 24h response, provide repair plan or free replacement of defective materials |
| Spare parts service | 10% extra top granules can be ordered with shipment for future repairs |
| Training | Online mixing & application training for bulk buyers |
Q1: What is the difference between composite track and porous track?
→ The composite track has an additional reinforcement layer above the elastic layer, making it denser, with better rebound and higher wear resistance – suitable for high-frequency use – while still retaining some drainage ability.
Q2: Is the composite track suitable for rainy or hot regions?
→ Yes. The base layer still has some porosity to release moisture, reducing blistering risk; the reinforcement layer improves overall durability.
Q3: Does recycled granule affect running feel?
→ No. Recycled granules have slightly lower elasticity but are fine for fitness and school use. We recommend recycled for base layer and virgin for reinforcement & top layers for best cost-performance balance.
Q4: Can I buy only materials without installation service?
→ Yes. We focus on material supply and provide full drawings and guidance for self-installation, or can recommend local contractors.
Q5: What is the MOQ?
→ No minimum. Any quantity from a few drums/bags to thousands of tons.
Q6: What binder packages are available?
→ Standard 200kg steel drum; also 20kg plastic drum for easy handling and small jobs.
Ready to upgrade your track project?
Email: zhu@ldsflooring.com
WhatsApp: ![]()
WeChat: +86 18928360800
Foamed Full PU Running Track 13mm 15mm Athletic Running Track For Athlete Protection
Competition Grade Synthetic Running Track Foamed Polyurethane Running Track Microfoam Resilience
13mm Prefabricated Running Track Microfoam Rubber Jogging Track Lightweight
Eco Synthetic Running Track Low VOC Running Track System Green For LEED Schools
10mm - 15mm running track flooring Purple Stadium Running Track For Stadium Renovations
Blue PU Running Track 13mm 15mm All Weather Running Track Unmatched Performance
All Weather Synthetic Jogging Track UV Resistant Synthetic Athletic Track
Eco Full PU Running Track System Low VOC Outdoor Running Track For LEED Certified Schools
Purple Indoor Running Track 6mm - 10mm Training Track For Sports Halls
Eco Friendly Prefabricated Running Track Recycled EPDM Rubber Running Track UV Resistant
6mm - 10mm Rubber Running Track Multi Purpose EPDM Jogging Track
8mm - 13mm Prefabricated Running Track Yellow Custom Running Track For Tight Schedules
