Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
|
Product Details:
Payment & Shipping Terms:
|
| Features: | Breathable, Cost-Effective, Quick Drainage | Name: | Permeable Running Track |
|---|---|---|---|
| Type: | Water-Permeable PU Track | Structure: | PU Bonded EPDM + SBR Base Layer |
| Thickness: | 13mm Standard | Drainage: | Permeable, No Ponding |
| Impact_Absorption: | 35-45% | Service_Life: | 8-10 Years |
| Application: | Training, School, Community | ||
| Highlight: | 13mm Permeable Running Track,All Weather Synthetic Rubber Track,Synthetic Rubber Track Breathable |
||
Key Advantages: Water‑permeable & breathable | Moderate elasticity | Fast installation | Recycled or virgin granules | Compliant with World Athletics standards
The Breathable Porous Running Track is a sports surfacing system characterized by its open‑cell structure. The base layer is a mixture of single‑component polyurethane binder and rubber granules, while the top layer consists of EPDM or fine rubber granules sprayed with binder. Its unique porosity allows rainwater to drain quickly and water vapor to escape naturally, preventing blistering or delamination.
Ideal for school sports fields, community jogging trails, park pathways, training tracks at sports centers – non‑competition venues (can also meet local competition standards).
|
Parameter |
Value |
World Athletics Requirement |
|
Thickness |
13mm standard (10mm base + 3mm top), customizable 8–20mm |
Synthetic surface ≥13mm |
|
Impact Absorption |
35–45% |
35–50% |
|
Vertical Deformation |
0.6–2.5mm |
0.6–2.5mm |
|
Friction Coefficient (dry/wet) |
0.5–0.8 |
≥0.5 (wet) |
|
Tensile Strength |
≥0.5 MPa |
≥0.5 MPa |
|
Elongation at Break |
≥40% |
≥40% |
|
Water Permeability |
≥2.0 mm/min |
Required for porous systems |
|
Environmental Standards |
RoHS, REACH, no heavy metals, low VOC |
— |
|
Service Life |
8–12 years under normal use |
— |
All data can be supported by third‑party test reports (SGS, TÜV, etc.) according to World Athletics (ex‑IAAF) recommendations for training and recreational tracks.
![]()
Key feature: honeycomb micro‑pores allow water and air passage, heat does not accumulate.
We offer two sources of granules:
|
Type |
Source |
Advantage |
Recommended for |
|
Recycled Granules |
Recycled tire rubber |
Low cost, eco‑friendly, adequate elasticity |
Community paths, school non‑competition areas |
|
Virgin Granules |
Virgin EPDM or high‑strength SBR |
Long‑lasting color, stable performance, high rubber content |
Professional training tracks, premium sports parks |
Both types can be used in base or top layer. Mixed ratios available to balance cost and performance.
|
Country |
Project Type |
Area |
Granule Choice |
Year |
|
Manila, Philippines |
International school track |
3,200 m² |
Virgin (EPDM top) |
2024 |
|
Nairobi, Kenya |
Community stadium |
5,000 m² |
Recycled base + virgin top |
2023 |
|
Riyadh, Saudi Arabia |
Park jogging trail |
2,800 m² |
100% recycled |
2024 |
|
Lima, Peru |
University training track |
4,500 m² |
Virgin (UV‑resistant) |
2025 |
On‑site photos & videos available upon request.
No MOQ – Whether you need materials for a 10 m² repair or a 10,000 m² full track, we can supply. Sample orders and small trial batches are welcome.
|
Service |
Description |
|
Installation guidance |
English construction video, written SOP; on‑site technician available (fee negotiable) |
|
Warranty |
2–5 years for materials (depending on series), 8 years for structural integrity |
|
Claim response |
24h response, provide repair plan or free replacement of defective materials |
|
Spare parts |
10% extra top granules can be ordered with shipment for future repairs |
|
Training |
Online mixing & application training for bulk buyers |
Q1: Is the porous track suitable for rainy or hot regions?
→ Yes. Pores drain water quickly and prevent heat buildup, reducing blistering risk.
Q2: Does recycled granule affect running feel?
→ No. Recycled granules have slightly lower elasticity but are fine for fitness and school use. We recommend recycled for base + virgin for top layer.
Q3: Can I buy only materials without installation service?
→ Yes. We focus on material supply; we provide full drawings and guidance for self‑installation, or can recommend local contractors.
Q4: What is the MOQ?
→ No minimum. Any quantity from a few drums/bags to thousands of tons.
Q5: Do you provide samples for testing?
→ Free A4 color panel. For large orders, 1‑2 drums of binder + granule samples can be sent for trial paving.
Q6: What binder packages are available?
→ Standard 200kg steel drum; also 20kg plastic drum for easy handling and small jobs.
Ready to upgrade your track project?
Email: zhu@ldsflooring.com
WhatsApp: ![]()
WeChat: +86 18928360800
Foamed Full PU Running Track 13mm 15mm Athletic Running Track For Athlete Protection
Competition Grade Synthetic Running Track Foamed Polyurethane Running Track Microfoam Resilience
13mm Prefabricated Running Track Microfoam Rubber Jogging Track Lightweight
Eco Synthetic Running Track Low VOC Running Track System Green For LEED Schools
10mm - 15mm running track flooring Purple Stadium Running Track For Stadium Renovations
Blue PU Running Track 13mm 15mm All Weather Running Track Unmatched Performance
All Weather Synthetic Jogging Track UV Resistant Synthetic Athletic Track
Eco Full PU Running Track System Low VOC Outdoor Running Track For LEED Certified Schools
Purple Indoor Running Track 6mm - 10mm Training Track For Sports Halls
Eco Friendly Prefabricated Running Track Recycled EPDM Rubber Running Track UV Resistant
6mm - 10mm Rubber Running Track Multi Purpose EPDM Jogging Track
8mm - 13mm Prefabricated Running Track Yellow Custom Running Track For Tight Schedules
