Home ProductsPermeable Running Track

Breathable Permeable Running Track 13mm Athletics Track For Tight Deadlines

I'm Online Chat Now

Breathable Permeable Running Track 13mm Athletics Track For Tight Deadlines

Breathable Permeable Running Track 13mm Athletics Track For Tight Deadlines
Breathable Permeable Running Track 13mm Athletics Track For Tight Deadlines

Large Image :  Breathable Permeable Running Track 13mm Athletics Track For Tight Deadlines

Product Details:
Place of Origin: Huizhou, Guangdong, China
Brand Name: lida&lvhuan
Certification: ISO 9001 (Quality Management) ,ISO 14001 (Environmental Management),CE
Model Number: Please refer to the model numbers in the product catalog
Payment & Shipping Terms:
Minimum Order Quantity: 20KG& 500 sqm
Price: between 18 and 52 USD
Packaging Details: 20kg/barrel,25kg/barrel,30kg/barrel,200kg/barrel, 300kg/barrel, 25kg/bag
Delivery Time: Normal delivery time: Shipment within 15 days after order confirmation
Payment Terms: EXW
Supply Ability: Monthly supply: 1000–12000 tons&The quantity ranges from 500,000 to 2,000,000 square meters, but it mainly depends on the product.
Detailed Product Description
Features: Fast Cure, Quick Drainage, Minimal Downtime Name: Permeable Running Track
Type: Fast-Lay Permeable PU Track Structure: Quick-Cure PU + EPDM Top
Thickness: 13mm Installation: 5-7 Day Full Installation
Drainage: Permeable, Fast Draining Impact_Absorption: 35-45%
Service_Life: 8-10 Years Application: Renovations, Tight Deadlines, Schools
Highlight:

Breathable Permeable Running Track

,

Permeable Running Track 13mm

,

13mm Athletics Track

Rapid Installation Track For Renovations Best For Tight Deadlines, Stadium Retrofits, Multi‑Sport Conversions

Key Advantages: Covers asphalt or concrete directly | Full install in 5–7 days | No specialist curing required | Playable in 48 hours after finishing | Ideal for school holidays

Product Overview

The rapid‑install version of the breathable porous track is designed for fast‑track projects where time on site is limited. Its single‑component binder cures quickly under ambient conditions, and the open‑cell surface does not require perfect base flatness – minor irregularities are absorbed. A 400m track can be overlaid on existing asphalt in 6 days by a 6‑person crew, compared to 12–15 days for traditional systems.

Perfect for school summer breaks, stadium refurbishments before a tournament, or converting tennis courts to multi‑use tracks.

Technical Specifications – Installation Focus
Parameter Value
Minimum base cure time Existing asphalt – ready immediately; new concrete – 14 days
Installation rate 600–800 m²/day (team of 6)
Time to walk after finish 24 hours
Time for full running 48 hours
Thickness 10–13mm (can be as low as 8mm for non‑competition)
Impact Absorption 35–42% (slightly firmer for quick install)
Weather restriction during install No rain; temperature 5–35°C

All other World Athletics training track parameters are met.

Why So Fast?
  • Single‑component PU – no field mixing errors, ready to pour.

  • No primer needed on clean asphalt – saves one day.

  • Spray coating applied wet‑on‑wet – no drying between layers.

  • No heavy rollers – simple manual screeding.

Ideal Scenarios
  • School tracks required before term starts

  • University facilities between semesters

  • Indoor sports halls converting to multi‑use

  • Temporary event flooring (can be removed later)

Process Comparison
Step Traditional PU Track Rapid Porous Track
Base preparation 2 days (grinding + priming) 0.5 day (pressure wash)
Base layer curing 24h 6h
Top layer + curing 2 days 1 day
Line marking 1 day 0.5 day
Total 12–15 days 5–7 days
Project Example – 48‑Hour Turnaround

Bangkok, Thailand – International school needed a new 200m track before a Friday sports day. Installation started Monday morning; Wednesday afternoon the track was playable. Total 3,200 m².

MOQ & Services

No minimum. Sample panels shipped within 3 days. We provide video call guidance during your first installation day.

FAQ – Rapid Install

Q: Is the durability the same?
→ Yes, 8+ years. The faster process does not compromise chemical cure.

Q: Can we install it ourselves?
→ Yes – we supply full video SOP, written guide, and remote support. Optional paid technician visit.

Contact: zhu@ldsflooring.com | WhatsApp +86 18928360800

Contact Details
Guangdong Lvhuan Environmental Protection Technology Co., Ltd.

Contact Person: Jay zhu

Tel: 18928360800

Send your inquiry directly to us (0 / 3000)