Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
|
Product Details:
Payment & Shipping Terms:
|
| Features: | Fast Cure, Quick Drainage, Minimal Downtime | Name: | Permeable Running Track |
|---|---|---|---|
| Type: | Fast-Lay Permeable PU Track | Structure: | Quick-Cure PU + EPDM Top |
| Thickness: | 13mm | Installation: | 5-7 Day Full Installation |
| Drainage: | Permeable, Fast Draining | Impact_Absorption: | 35-45% |
| Service_Life: | 8-10 Years | Application: | Renovations, Tight Deadlines, Schools |
| Highlight: | Breathable Permeable Running Track,Permeable Running Track 13mm,13mm Athletics Track |
||
Key Advantages: Covers asphalt or concrete directly | Full install in 5–7 days | No specialist curing required | Playable in 48 hours after finishing | Ideal for school holidays
The rapid‑install version of the breathable porous track is designed for fast‑track projects where time on site is limited. Its single‑component binder cures quickly under ambient conditions, and the open‑cell surface does not require perfect base flatness – minor irregularities are absorbed. A 400m track can be overlaid on existing asphalt in 6 days by a 6‑person crew, compared to 12–15 days for traditional systems.
Perfect for school summer breaks, stadium refurbishments before a tournament, or converting tennis courts to multi‑use tracks.
| Parameter | Value |
|---|---|
| Minimum base cure time | Existing asphalt – ready immediately; new concrete – 14 days |
| Installation rate | 600–800 m²/day (team of 6) |
| Time to walk after finish | 24 hours |
| Time for full running | 48 hours |
| Thickness | 10–13mm (can be as low as 8mm for non‑competition) |
| Impact Absorption | 35–42% (slightly firmer for quick install) |
| Weather restriction during install | No rain; temperature 5–35°C |
All other World Athletics training track parameters are met.
Single‑component PU – no field mixing errors, ready to pour.
No primer needed on clean asphalt – saves one day.
Spray coating applied wet‑on‑wet – no drying between layers.
No heavy rollers – simple manual screeding.
School tracks required before term starts
University facilities between semesters
Indoor sports halls converting to multi‑use
Temporary event flooring (can be removed later)
| Step | Traditional PU Track | Rapid Porous Track |
|---|---|---|
| Base preparation | 2 days (grinding + priming) | 0.5 day (pressure wash) |
| Base layer curing | 24h | 6h |
| Top layer + curing | 2 days | 1 day |
| Line marking | 1 day | 0.5 day |
| Total | 12–15 days | 5–7 days |
Bangkok, Thailand – International school needed a new 200m track before a Friday sports day. Installation started Monday morning; Wednesday afternoon the track was playable. Total 3,200 m².
No minimum. Sample panels shipped within 3 days. We provide video call guidance during your first installation day.
Q: Is the durability the same?
→ Yes, 8+ years. The faster process does not compromise chemical cure.
Q: Can we install it ourselves?
→ Yes – we supply full video SOP, written guide, and remote support. Optional paid technician visit.
Contact: zhu@ldsflooring.com | WhatsApp +86 18928360800
Foamed Full PU Running Track 13mm 15mm Athletic Running Track For Athlete Protection
Competition Grade Synthetic Running Track Foamed Polyurethane Running Track Microfoam Resilience
13mm Prefabricated Running Track Microfoam Rubber Jogging Track Lightweight
Eco Synthetic Running Track Low VOC Running Track System Green For LEED Schools
10mm - 15mm running track flooring Purple Stadium Running Track For Stadium Renovations
Blue PU Running Track 13mm 15mm All Weather Running Track Unmatched Performance
All Weather Synthetic Jogging Track UV Resistant Synthetic Athletic Track
Eco Full PU Running Track System Low VOC Outdoor Running Track For LEED Certified Schools
Purple Indoor Running Track 6mm - 10mm Training Track For Sports Halls
Eco Friendly Prefabricated Running Track Recycled EPDM Rubber Running Track UV Resistant
6mm - 10mm Rubber Running Track Multi Purpose EPDM Jogging Track
8mm - 13mm Prefabricated Running Track Yellow Custom Running Track For Tight Schedules
