Home ProductsSynthetic Running Track

Microfoam Synthetic Running Track Rapid Installation Sports Running Track Blue

I'm Online Chat Now

Microfoam Synthetic Running Track Rapid Installation Sports Running Track Blue

Microfoam Synthetic Running Track Rapid Installation Sports Running Track Blue
Microfoam Synthetic Running Track Rapid Installation Sports Running Track Blue Microfoam Synthetic Running Track Rapid Installation Sports Running Track Blue

Large Image :  Microfoam Synthetic Running Track Rapid Installation Sports Running Track Blue

Product Details:
Place of Origin: Huizhou, Guangdong, China
Brand Name: lida&lvhuan
Certification: ISO 9001 (Quality Management) ,ISO 14001 (Environmental Management),CE
Model Number: Please refer to the model numbers in the product catalog
Payment & Shipping Terms:
Minimum Order Quantity: 20KG& 500 sqm
Price: between 18 and 52 USD
Packaging Details: 20kg/barrel,25kg/barrel,30kg/barrel,200kg/barrel, 300kg/barrel, 25kg/bag
Delivery Time: Normal delivery time: Shipment within 15 days after order confirmation
Payment Terms: EXW
Supply Ability: Monthly supply: 1000–12000 tons&The quantity ranges from 500,000 to 2,000,000 square meters, but it mainly depends on the product.
Detailed Product Description
Features: Fast Cure, Ready In 72 Hours Name: Synthetic Running Track
Structure: Fast-Cure Microfoam + EPDM Top Thickness: 13mm (10+3mm), 10-15mm Range
Top_Layer: Virgin EPDM, 18-22% Rubber Installation: 700-900 M²/Day, 8-Day Full
Impact_Absorption: 42-47% Service_Life: 10-12 Years
Application: Renovations, Tight Deadlines
Highlight:

Microfoam Synthetic Running Track

,

Rapid Installation Sports Running Track

,

Sports Running Track Blue

Rapid Installation Foamed Full PU Track | Microfoam Comfort in Just 8 Days

Key Advantages: Fast‑cure microfoam PU binder | Installation rate 700–900 m²/day | Usable in 72 hours after finish | No extended curing between layers | Ideal for pre‑season facility upgrades

Product Overview

The Rapid Installation Foamed Full PU Track combines the comfort of microfoam technology with a fast‑cure binder system. The microfoam elastic layer cures in 12 hours (normally 24–36 hours), and the top coat cures in 12 hours (normally 48 hours). A full 13mm track can be installed by a 6‑person crew in 7–8 days, compared to 15–18 days for standard foamed systems. The track is ready for line marking and competition use within 72 hours of finishing the top coat.

Perfect for sports centres preparing for upcoming seasons, school stadiums during short holiday breaks, clubs needing rapid upgrades, and last‑minute event venue preparations.

Technical Specifications – Installation Focus
Parameter Value
Minimum base cure Old asphalt: immediate; new concrete: 10 days
Installation rate 700–900 m2/day (6 workers)
Microfoam base layer cure 12 hours
Top coat cure 12 hours
Time to competition use 72 hours after top coat
Total thickness 13mm (10+3) – can be 10–15mm
Impact absorption 42–47% (within standard)

All other mechanical properties meet World Athletics standards.

Installation Comparison
Step Standard Foamed Full PU Rapid Foamed Full PU
Base prep 1–2 days 0.5 day (wash only)
Microfoam pour & cure 1.5 days (pour + 24h cure) 1.5 days (pour + 12h cure)
Top coat & scatter 1.5 days (pour + 48h cure) 1.5 days (pour + 12h cure)
Total 15–18 days 7–8 days
Recommended EPDM – Standard virgin grade (18–22% rubber content)
Applications – Time‑sensitive
  • Sports centres upgrading before league season

  • School stadiums during summer/winter breaks

  • University track renovations between semesters

  • Clubs needing rapid facility upgrades for tournaments

Case Studies (Rapid Install Foamed)
Country Project Area Install time Year
Malaysia International school stadium 3,200 m² 8 days 2024
UAE Sports club training track 4,000 m² 7.5 days 2025
Chile University competition track 2,900 m² 7 days 2024
Shipping & MOQ

No MOQ. Fast‑cure microfoam binder shelf life: 2 months – order when ready to install. Lead time 15 days.

FAQ – Rapid Install Foamed

Q: Does fast cure affect the microfoam structure?
→ No. The cell formation is controlled by a separate foaming catalyst – fast cure only reduces waiting time, not final properties.

Q: Can it be installed in cold weather?
→ Minimum application temperature is 10°C. For colder climates, we supply a cold‑cure additive.

Contact: zhu@ldsflooring.com | WhatsApp +86 18928360800

Contact Details
Guangdong Lvhuan Environmental Protection Technology Co., Ltd.

Contact Person: Jay zhu

Tel: 18928360800

Send your inquiry directly to us (0 / 3000)