Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
|
Product Details:
Payment & Shipping Terms:
|
| Features: | Fast Installation, Minimal Downtime | Name: | EPDM Rubber Surface |
|---|---|---|---|
| Type: | Fast-Lay EPDM Surface | Structure: | Quick-Cure PU + EPDM Top |
| Thickness: | 10-15mm | Installation: | 5-7 Day Full Installation |
| Impact_Absorption: | 40-50% | Service_Life: | 8-10 Years |
| Application: | Renovations, Holiday Projects | ||
| Highlight: | 10mm EPDM Rubber Surface,15mm EPDM Rubber Surface,Recycled Base Outdoor Playground Flooring |
||
The Rapid‑Install EPDM Sports Surface is designed for tight schedules. Using a special fast‑cure PU binder, the base layer cures in 6–8 hours (normally 24h) and the top layer cures in 12 hours (normally 48h). A complete 13mm EPDM surface (recycled base + EPDM top) can be installed by a 4‑person crew in 5–7 days, compared to 12–15 days for standard systems. The surface is ready for use within 48 hours of finishing the top coat. Perfect for school playgrounds that must be ready before term starts, or community courts needed for a weekend event.
Ideal for: school summer/winter break projects, community court renovations, club facility upgrades, and last‑minute event preparations.
| Parameter | Value |
|---|---|
| Total Thickness | 13mm (10+3) |
| Base layer cure time | 6–8 hours |
| Top layer cure time | 12 hours |
| Time to use | 48 hours after top coat |
| Installation rate | 600–800 m²/day (4 workers) |
| Impact absorption | 30–40% (standard) |
| Service Life | 8–10 years |
| Step | Standard System | Rapid‑Install System |
|---|---|---|
| Base prep | 1–2 days | 0.5 day (wash only) |
| Base layer pour & cure | 1 day + 24h | 1 day + 8h |
| Top layer spray & cure | 1 day + 48h | 1 day + 12h |
| Total | 12–15 days | 5–7 days |
| Country | Project | Area | Install time | Year |
|---|---|---|---|---|
| Malaysia | International school (holiday project) | 1,200 m² | 6 days | 2024 |
| Saudi Arabia | Community court (event deadline) | 800 m² | 5 days | 2025 |
| Chile | Club playground (season start) | 500 m² | 5 days | 2024 |
Same as standard. Fast‑cure binder shelf life: 2 months. Lead time 15 days. No MOQ.
Q: Does fast cure affect durability?
→ No. Final mechanical properties meet all relevant standards. Only the curing speed is increased.
Q: Can we use recycled base with this system?
→ Yes. The fast‑cure binder works with both recycled and virgin base granules.
Contact: zhu@ldsflooring.com | WhatsApp +86 18928360800
Foamed Full PU Running Track 13mm 15mm Athletic Running Track For Athlete Protection
Competition Grade Synthetic Running Track Foamed Polyurethane Running Track Microfoam Resilience
13mm Prefabricated Running Track Microfoam Rubber Jogging Track Lightweight
Eco Synthetic Running Track Low VOC Running Track System Green For LEED Schools
10mm - 15mm running track flooring Purple Stadium Running Track For Stadium Renovations
Blue PU Running Track 13mm 15mm All Weather Running Track Unmatched Performance
All Weather Synthetic Jogging Track UV Resistant Synthetic Athletic Track
Eco Full PU Running Track System Low VOC Outdoor Running Track For LEED Certified Schools
Purple Indoor Running Track 6mm - 10mm Training Track For Sports Halls
Eco Friendly Prefabricated Running Track Recycled EPDM Rubber Running Track UV Resistant
6mm - 10mm Rubber Running Track Multi Purpose EPDM Jogging Track
8mm - 13mm Prefabricated Running Track Yellow Custom Running Track For Tight Schedules
