Home ProductsHybrid Running Track

Rapid Installation Hybrid Running Track 13mm Sandwich System Running Track For Tight Deadlines

I'm Online Chat Now

Rapid Installation Hybrid Running Track 13mm Sandwich System Running Track For Tight Deadlines

Rapid Installation Hybrid Running Track 13mm Sandwich System Running Track For Tight Deadlines
Rapid Installation Hybrid Running Track 13mm Sandwich System Running Track For Tight Deadlines

Large Image :  Rapid Installation Hybrid Running Track 13mm Sandwich System Running Track For Tight Deadlines

Product Details:
Place of Origin: Huizhou, Guangdong, China
Brand Name: lida&lvhuan
Certification: ISO 9001 (Quality Management) ,ISO 14001 (Environmental Management),CE
Model Number: Please refer to the model numbers in the product catalog
Payment & Shipping Terms:
Minimum Order Quantity: 20KG& 500 sqm
Price: between 18 and 52 USD
Packaging Details: 20kg/barrel,25kg/barrel,30kg/barrel,200kg/barrel, 300kg/barrel, 25kg/bag
Delivery Time: Normal delivery time: Shipment within 15 days after order confirmation
Payment Terms: EXW
Supply Ability: Monthly supply: 1000–12000 tons&The quantity ranges from 500,000 to 2,000,000 square meters, but it mainly depends on the product.
Detailed Product Description
Features: Fast Installation, Quick Turnaround Name: Hybrid Running Track
Type: Fast-Lay Sandwich System Track Structure: Fast-Cure PU+SBR Elastic + EPDM
Thickness: 13mm Installation: 7-8 Day Full Installation
Impact_Absorption: 35-45% Service_Life: 8-10 Years
Application: Renovations, Tight Deadlines
Highlight:

Rapid Installation Hybrid Running Track

,

Hybrid Running Track 13mm

,

13mm Sandwich System Running Track

Rapid Installation Mixed Running Track Best For Tight deadlines, stadium renovations, school holiday projects

Key Advantages: Fast‑cure PU binder system | Installation rate 800–1000 m²/day | Usable in 72 hours after finish | No extended curing required | Ideal for last‑minute event preparations

Product Overview

The Rapid Installation Mixed Running Track uses a specially formulated fast‑cure PU binder that reduces interlayer drying time. A standard 13mm mixed track (10mm base + 3mm top) can be fully installed by a 6‑person crew in 6–7 days, compared to 12–15 days for conventional mixed systems. The base layer cures in 8 hours instead of 24; the top pure PU coat cures in 12 hours. The track is ready for line marking and competition use within 72 hours of the final coat.

Perfect for sports centres needing quick turnaround, school stadiums during short holidays, and event venues preparing for upcoming tournaments.

Technical Specifications – Installation Focus
Parameter Value
Minimum base cure Old asphalt: immediate; new concrete: 10 days
Installation rate 800–1000 m²/day (6 workers)
Base layer cure time 8 hours
Top coat cure time 12 hours
Time to competition use 72 hours after top coat
Total thickness 13mm (10+3) – can be reduced to 10mm for low‑use
Impact absorption 38–45% (within standard)

All other mechanical properties meet World Athletics training/competition standards.

Installation Comparison
Step Standard Mixed Rapid Mixed
Base prep 1–2 days 0.5 day (wash only)
Base layer mix & pour 1 day 1 day
Base cure 24h 8h
Top coat mix & scatter 1 day 1 day
Top cure 24–48h 12h
Total 12–15 days 6–7 days
Recommended Granules – Same as standard mixed (recycled or virgin)
Applications – Time‑sensitive
  • School stadiums during summer/winter break

  • University track renovations between semesters

  • Sports club facility upgrades before league season

  • Event venues preparing for competition

Case Studies (Rapid Install Mixed)
Country Project Area Install time Year
Thailand International school stadium 3,600 m² 6 days 2024
UAE Sports club main track 4,000 m² 7 days 2025
Mexico University competition track 3,200 m² 6.5 days 2024
Shipping & MOQ

No MOQ. Fast‑cure binder has shorter shelf life (2 months) – order when ready to install. Lead time 15 days.

FAQ – Rapid Install Mixed

Q: Does fast cure reduce durability?

→ No. The final mechanical properties are equal to standard mixed systems. Service life remains 8–10 years.

Q: Can we install it in cold weather?

→ Minimum application temperature is 10°C. For colder conditions, we supply a cold‑cure additive.

Contact: zhu@ldsflooring.com | WhatsApp +86 18928360800

Contact Details
Guangdong Lvhuan Environmental Protection Technology Co., Ltd.

Contact Person: Jay zhu

Tel: 18928360800

Send your inquiry directly to us (0 / 3000)