Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
|
Product Details:
Payment & Shipping Terms:
|
| Features: | Fast Installation, Low Downtime | Name: | Cushioned Acrylic Surface |
|---|---|---|---|
| Type: | Fast-Cure Cushioned System | Structure: | Quick-Cure Rubber + Acrylic Top |
| Thickness: | 3-5mm | Installation: | 5-7 Day Full Installation |
| Application: | Renovations, Tight Deadlines | Service_Life: | 6-8 Years |
| Highlight: | Elastic Cushioned Acrylic Surface,Cushioned Acrylic Surface 3mm,5mm Acrylic Court Surface |
||
Key Advantages:
Product Overview
The Rapid‑Install Elastic Acrylic system uses a fast‑cure water‑based acrylic binder that significantly reduces drying time between coats. A standard 4 mm elastic layer (3 coats of rubber‑acrylic mix) dries in 2 hours per coat instead of 4‑6 hours. The full system – base priming, 3‑4 rubber coats, 2 mid coats, and a top colour coat – can be completed in 5‑7 days by a 3‑person crew, compared to 10‑14 days for standard elastic acrylic. The final surface provides 20‑30% shock absorption and meets ITF Category 3 ball bounce. Perfect for schools that need a cushioned court before term starts, or clubs hosting a tournament with a fixed date.
✅ Ideal for: school holiday projects, urgent court refurbishments, tournament venues with tight schedules, and temporary event courts.
| Parameter | Value |
|---|---|
| Total system thickness | 4–5 mm (3‑4 mm elastic + 1 mm colour) |
| Drying time per rubber coat (25°C) | 2 hours (standard 4‑6h) |
| Full cure to play | 48 hours |
| Total installation time (400 m²) | 5–7 days (3 workers) |
| Shock absorption | 20–30% |
| Service life | 8‑10 years (with EPDM rubber) |
| Step | Standard Elastic Acrylic | Rapid‑Install |
|---|---|---|
| Base prep | 1 day | 0.5 day |
| Elastic layer (3 coats) | 3 days (each 4‑6h dry) | 1.5 days (each 2h dry) |
| Mid coats (2 coats) | 1 day | 0.5 day |
| Top coat + texture | 0.5 day + 24h cure | 0.5 day + 12h cure |
| Total | 10‑14 days | 5‑7 days |
| Country | Project | Area | Thickness | Install time | Year |
|---|---|---|---|---|---|
| UAE | International school (holiday project) | 450 m² | 4 mm | 6 days | 2024 |
| Mexico | Club tennis court (tournament deadline) | 1 court | 5 mm | 7 days | 2025 |
| India | Urgent community court repair | 300 m² | 4 mm | 5 days | 2024 |
Same as standard. Fast‑cure acrylic binder has 6‑month shelf life. Lead time 15 days. No MOQ.
Q: Does fast cure affect shock absorption or durability?
→ No. Final mechanical properties and cushioning are identical to standard elastic acrylic. Only the drying speed is increased.
Q: Can I use this system indoors?
→ Yes. Low VOC and fast drying make it suitable for indoor sports halls with adequate ventilation.
Contact: zhu@ldsflooring.com | WhatsApp +86 18928360800
Foamed Full PU Running Track 13mm 15mm Athletic Running Track For Athlete Protection
Competition Grade Synthetic Running Track Foamed Polyurethane Running Track Microfoam Resilience
13mm Prefabricated Running Track Microfoam Rubber Jogging Track Lightweight
Eco Synthetic Running Track Low VOC Running Track System Green For LEED Schools
10mm - 15mm running track flooring Purple Stadium Running Track For Stadium Renovations
Blue PU Running Track 13mm 15mm All Weather Running Track Unmatched Performance
All Weather Synthetic Jogging Track UV Resistant Synthetic Athletic Track
Eco Full PU Running Track System Low VOC Outdoor Running Track For LEED Certified Schools
Purple Indoor Running Track 6mm - 10mm Training Track For Sports Halls
Eco Friendly Prefabricated Running Track Recycled EPDM Rubber Running Track UV Resistant
6mm - 10mm Rubber Running Track Multi Purpose EPDM Jogging Track
8mm - 13mm Prefabricated Running Track Yellow Custom Running Track For Tight Schedules
